With the ever-ongoing ‘progress’ of the proposed UK nuclear power plants, I wonder if this is the best course of action (not just in the UK, but across other nations also)?
With the ever-ongoing ‘progress’ of the proposed UK nuclear power plants, I wonder if this is the best course of action (not just in the UK, but across other nations also)?
Lmao ok
If I remember correctly, it’s about 5 million US dollars per kilometer of overhead high voltage DC lines you run. I’m going to assume that putting those cables under the English channel will cost three to eight times that much being generous.
It depends on the distance actually. It’s the conversion stations that are expensive so as you cover longer distances and able to go even higher in volts the costs per km goes down
Those cables already exist
https://en.wikipedia.org/wiki/High-voltage_direct_current
No those cables max out at 2GWh. The Britts would only need 45 times the current capacity that currently exists to function daily.
Cool, build them then