Unfortunately, time and money are factors. Not that I want to cheap out, I just thought maybe a sub panel might be more economical.
They wouldn’t know to check the kitchen has its own sub panel.
I mean, when there’s only a 40 amp breaker labeled “Kitchen S/P” I think they’d figure it out.
I have room in the panel now, that’s not the problem. Was just thinking it would be more economical to run one big circuit from the basement up to the kitchen and do the breakout there versus running 4-6 new individual circuits all that way.
Upgrading to a 200A panel is on the horizon though not right at this moment.