Now is time for some panicky wait time. I’m really hoping I did not forget anything critical. If everything goes to plan we’ll be 4 to man the gigantic pump I requested and reel the cement mix in place. I have some shovels, rakes and I rented a vibrating ruler to help the finish.

weather is back to seasonal normals at around 25 after too many weeks over 30+.

Still I’m pretty sure I’m forgetting something.

        • a4ng3l@lemmy.worldOP
          link
          fedilink
          arrow-up
          6
          ·
          9 days ago

          They just make sure the metal meshing stays in the middle of the slab and doesn’t go straight to the bottom. Also they go sssSsSSSsssss.

          • grue@lemmy.world
            link
            fedilink
            arrow-up
            3
            ·
            edit-2
            9 days ago

            The mesh should be about 1/3 of the way up from the bottom, not in the middle. The point of the reinforcement is to resist tensile stress, and the stress in the middle is 0.

            Tensile stress increases linearly to the bottom of the slab, but you can’t put the metal all the way at the bottom because you need enough concrete under it to embed it properly.

            (I realize you probably didn’t mean “middle” literally, but just in case…)

            • a4ng3l@lemmy.worldOP
              link
              fedilink
              arrow-up
              3
              ·
              9 days ago

              That’s actually a welcomed confirmation :) They are 4cm up the bottom and the slab is 12cm itself. So we are tight at a 3rd 🎉